BTS ON-Line commissioning Procedure using B10 Go to configuration>> Hardware setting>>Begin HW modification. Edit Sector Mapping and. Alcatel Bts Installation And Commissioning Pdf. BTS OFF-Line commissioning. Procedure OF ALCATEL BTS using B Prepared By: Umair. Installation & Commissioning – BTS, Microwave I&C of all Types of BTS-2G ( NSN, Ericsson, Huawei, ZTE, Alcatel-Lucent etc) in all possible installation types .

Author: Mezijora Gardall
Country: Paraguay
Language: English (Spanish)
Genre: Finance
Published (Last): 15 May 2015
Pages: 423
PDF File Size: 3.59 Mb
ePub File Size: 5.70 Mb
ISBN: 171-6-15656-725-6
Downloads: 54688
Price: Free* [*Free Regsitration Required]
Uploader: Fenrikazahn

Remember me on this computer.

Access Technologies & Services LLC Qatar | Engineering Services Projects

Check also the voltage between neutral and ground See Figure 24 Result: Close the site and hand the keys to the key holder 8. Brushes cleaned and relaced. At BTS Terminal choose: Add Your Answer Tips for a great answer: Lately during the filling cycle water hammer is occurring. Wait for the test to finish 2. installatioon

Site administrators Project managers Field service technician Supervisors Occasional users e. Wait for the message “TRE sending is stopped”.

Posted by crushonyou on Jan 25, If it has not, the test must be carried out at the end of the commissioning procedure. Click [ Start ] A message window appears prompting you to connect the Abis shortcut connector wires will be used instead. Do the same for all the ANX modules! If there are no antennas: Click [ Confirm thresholds ] to update the Remote Inetallation 3.

Check that there are no alarms Result: See Figure 21 Supply for inatallation Heat 2. Check that the heat exchanger FANs on the rack doors start up 3.

Posted on Dec 30, Measure the voltage between the neutral and protective earth PE Result: Copy all the files into it from the floppy disk.

Check also the voltage between instxllation and ground Results: The protective earth is connected to the equipment unstallation terminal The electrical power to the equipment is disconnected from the site power panel. See Information Required Section 1. See Figure 46 Figure Switch off the service lights outdoor version.

BTS Installation and Commissioning

List of Installatoin Required Appendix B: Click [ Sector mapping ]. At BTS terminal choose: See and set the mapping of ANxs to sectors, check the bridges according to the requested configuration See Information Required Section 1. Want Answer 0 Clicking this will make more experts see the question and we will remind you when it gets answered.

When finished, click [ Manufacturing part ] 8. Te clamp bridge 3 in AC-outis present. Leave the BTS powered up 2.

BTS commissioning Alcatel A, n some troubleshooting – Fixya

Test the GPS 1. Login to post Please use English characters only. Wait until the connection with the BTS is re-established. Check the CCL 6.